Requirements for the installation of tubes
Fixing in place
When fixing the tubes in place:
- Use suitable tube clamps
- Attach tube clamps to suitable underground.
- Install tube clamp near the fitting (1).
- See table (2) for distance between tube clamps.
- Install tube clamps before and after bends (3).
- Note distance from the tube clamp to the bend.
- Do not directly connect tubes.
Outer tube diameter [mm] | Distance of tube clamps [m] |
---|
6 - 12 | 1,00 |
14 - 22 | 1,20 |
25 - 30 | 1,50 |
35 - 38 | 2,00 |
38 - 42 | 2,70 |
Requirements for the correct installation of tubes
- Pay attention to the thermal expansion of the tubes.
- Relieve tension with tube curves
- Determine the tube length very carefully.
- Make sure that the components can be easily accessed later on.
- Design the tube system in an organized manner.
- Install the tubes without tension.
Go back (Installation Guides)